简体中文 | 繁体中文 | ENG
The current position: Home
> Event > ChinaMedicalCity
Main work of 2nd-phase engineering of convention center in CMC finished
updated on :2016-06-15 15:43

Recently, citizens passing by the convention center in China Medical City (CMC) can surprisingly find that in the east of the 1st-phase engineering of the convention center, three buildings rise straight from the ground, which is the 2nd-phase engineering of the convention center under construction. At present, main work of conference center, dining center and exhibition center has been finished and entered period of interior trim, outdoor curtain secondary frame and embedded electromechanical equipment.

 

The 2nd-phase engineering of the convention center in CMC is invested by Taizhou Huaxin Pharmaceutical Investment Co., Ltd. and constructed by China Jiangsu International Economic and Technical Cooperation Group, Ltd. With total investment of about 1.2 billion yuan and construction area of 125,000 square meters, the project includes exhibition center, conference center and dining center. After completion of the 2nd-phase engineering, the convention center in CMC will get more reasonable layout and more perfect functions, greatly promote reception ability and service level, and become a first-rate exhibition hall possessing functions like demonstration, specialized transaction, holding international conferences and overall matching technique.

Copyright@2018 www.taizhou.gov.cn All Rights
Reserved Registration Number:苏ICP备05003226号-1-1
Produced By 大汉网络 大汉版通发布系统