简体中文 | 繁体中文 | ENG
The current position: Home
> Event > tushuotaizhou
Taizhou Railway Station
updated on :2016-07-18 16:03

 

Taizhou Railway Station officially opened to traffic on July 1, 2005. The main station building of the passenger station covers a total area of 12,400 square meters, and can hold over 1,800 passengers to wait for trains at the same time. As a city window and landmark building, Nanjing-Qidong Railway Taizhou Passenger Station has reflected the idea of people orientation in all aspects from design to construction. The platform adopts non-platform-column steel-structure canopy initiated by national railway, with an area of 43,500 square meters.

Copyright@2018 www.taizhou.gov.cn All Rights
Reserved Registration Number:苏ICP备05003226号-1-1
Produced By 大汉网络 大汉版通发布系统